Master Bath Demolition

While we were in California, we had our contractor go ahead and start demo on the master bath… and this is what we came home to:

IMG_4621 IMG_4625 IMG_4624

Isn’t that a pretty sight?  Oh the joys of construction…

It’s been about 2 weeks since these pictures were taken and since then we are making steady progress.  The frame of the shower is in, tile has been ordered and should arrive next week, all fixtures have been delivered, floors are in, plumber has re-piped everything, electrician will be installing recessed lighting tomorrow followed up with inspection on Friday, inspection on plumbing takes place on Monday, etc… exciting stuff! Not.

Pray for me y’all!  I would say we are barely half way done…


Stressed!

tumblr_m07n6jcthl1qbcq4oo1_500

The tub for the guest bathroom is going in today!  I’m praying that as these four young men carry this 400 pound monstrosity upstairs, they keep in mind that my windows are original…. and I just had my staircase and hallway painted… mmm-k? thanks!

Also, the space where the tub is supposed to go (from stud to stud) is 59″… yet the tub is 60″…. hmmmm…. interesting.

Wish me luck today!